Picture update time: Trim

| | Comments (0)

Here is the start of the baseboard molding

Picture 069.jpg

Picture 071.jpg

Picture 080.jpg

Picture update time: Copper Countertop

| | Comments (0)

Here the copper countertop for our bar.

The rough 10'x3' sheet of copper
Picture 031.jpg

The countertop installed
Picture 027.jpg

Picture 009.jpg

Picture update time: Kitchen

| | Comments (0)

Kitchen pictures:

Appliances being delivered.
Picture 033.jpg

Cabinets
Picture 012.jpg

Installed Double Oven
Picture 077.jpg

Picture update time: Vanities

| | Comments (0)

Here are some pictures of the vanities.

Completed 2nd floor vanity, made out of the same bamboo as the stairs.
Picture 011.jpg

Medicine Cabinets installed in the 3rd floor bath.
Picture 089.jpg

Picture update time: Stairs

| | Comments (0)

Sorry for all the long delays in pictures, here are some stair pictures.

This is the rough bamboo plywood cut and ready to assemble. These were originally 8'x4' sheets
Picture 019.jpg

Sealing the treads with poly. No stain because we wanted the nice natural look.
Picture 084.jpg

First stair installed.
Picture 081.jpg

2nd stair installed.
Picture 025.jpg

1st floor stairs.
Picture 015.jpg

Working on the 2nd floor stairs
Picture 017.jpg

Picture Update Time

| | Comments (0)

Ok, I have not updated my blog in a while so here come a lot of pictures!

Mostly we have been tiling.

Here are pictures of the 3rd floor master bath. Man did we put a lot of tile in there. (Thanks Kristens family for all the help!)

Looking at the back wall and the tub surround:
3rdBathTile.jpg

Completed back wall/tub surround:
3rdBathTile2.jpg

Recessed Medicine Cabinets over the vanity:
3rdBathTile3.jpg

Bathroom Entry:
3rdBathTile4.jpg

Shower Area:
3rdBathTile5.jpg

Finished Shower Area:
3rdBathTile6.jpg

Finished Shower Area:
3rdBathTile7.jpg

Grouted Area above toilet:
3rdBathTile8.jpg

Grouted area above bath tub:
3rdBathTile9.jpg

Grouted Shower Area:
3rdBathTile10.jpg

Now for some 2nd floor bath pictures.
This is the start of the back wall/tub/shower surround:
SecondBathTile.jpg

Back wall, these are very nice glass subway tiles:
SecondBathTile2.jpg

Shower Area (Kristen did not like the blue tiles in there, so they were removed):
SecondBathTile3.jpg

Shower Area:
SecondBathTile4.jpg

Window in the Shower area:
SecondBathTile5.jpg

Finished Shower Area:
SecondBathTile6.jpg

Back wall/Shower area:
SecondBathTile8.jpg

Kristen Grouting the back wall :)
SecondBathTile9.jpg

Cleaning the grout off of the wall:
SecondBathTile10.jpg

Completed Back wall:
SecondBathTile11.jpg

Tiling

| | Comments (0)

We started tiling the 3rd story bathroom this weekend. Our builder is working hard to get the greenboard up so that we can finish tiling. Hopefully it is finished now.

IMG_0309[1].jpg

They have also installed most of the windows and doors. Here is a picture of our new french doors on the 3rd floor, leading to the deck.
IMG_0306[1].jpg

Moving forward - Updates

| | Comments (0)

We are moving full steam ahead :)

They have finished framing the basement and 1st floor. They have paved the basement. We got our windows in and they are installing them. They have added the stairs. We have ordered our tile and hardwood floor. We have ordered our cabinets.

All is going at a great pace right now. They are starting on the electrical and hopefully soon the plumbing.

Here are some pictures:

I have completed putting up the old columns, now we just need to finish painting them (hint hint if someone wants to help)
IMG_0283[1].jpg

First Floor bathroom.
IMG_0295[1].jpg

Basement:
IMG_0296[1].jpg

Updates!

| | Comments (0)

It has been a long time since I have updated our status, so here is what has happened.

To start with, we have obtained all of our windows. Well, they have all been ordered and are scheduled to arrive in a few weeks. The major project of this was the French doors. Kristen found a really cheap set of really nice doors on Craigslist, about $3,000 off the original price. The only problem was getting the doors to our house as they were about an hour away. So I borrowed our contractors (C&D) truck.

The first problem, that I guess I was a little naive about, was how much this thing weighted. It is literally about a ton. I mean, we had 3 people and we could not lift this door more than about 8". We had to lift it, put bricks under it, lift it again, ect. until we got it high enough that we could back the truck under it. Then the next problem is that a 10' x 7' door does not really fit in a truck. We had this huge door hanging off the edge and back as I slowly drove home. Kristen had to drive it into the city the next day to drop it off. Everything turned out ok, but I do not think I would do it again.

They also dug out the basement. On inauguration day, I had a group of guys come and dig. They got the floor about 8' down, so when we pave it, we should end up with about 7'6" ceilings.

I also started sanding and finishing the porch columns. I have completed one, and it is up. The other two are rough sanded so I just have to run a quick finish sanding then paint, then put up. Here is a picture of the unfinished column.
column.JPG

Katie has also moved in with us so, we had to clean out the extra bedroom and put all the stuff we have bought in the living room. We got ride of our couch, which helps, but we still have a lot of stuff in there.

And we have finally picked out our kitchen. We even got a deal on the island. It was a floor model. $1,000 less than new cabinets plus it came with the butcher block counter.
IMG_0278[1].jpg

Updated House Pictures

| | Comments (0)

Here are some new pictures from the house. They have completed the 3rd story, completed the roof and completed most of the framing of the 3rd and 2nd story inside.

3rd Story:
IMG_0244[1].jpg

3rd Story vaulted ceiling:
IMG_0246[1].jpg

2nd Story:
IMG_0247[1].jpg